Located a short distance from the Panamericana Sur, on Santo Domingo de Los Olleros Avenue and next to the Dos Engie Thermal Power Plant.
Features:
- Electricity: active substation with a capacity of megas, transformer, knife switches, sectional cutoff switches, grounding well and electrical panel.
- Water: private well built with quality materials, with a depth of meters and water at meters.
- Floor: levelled and compacted.
- Fence: built with quality materials, meters high around the entire perimeter of the land. Foundations of ml x ml with 1-inch corrugated rebar; columns with tie rings made of corrugated rebar of ml and ml.
- Roof: more than m covered.
- Entrance: two gates ml wide, one double-leaf gate and the other sliding.